top of page
JRH Engineering & Environmental Services, Inc. Logo

JRH

Engineering & Environmental Services

JRH Engineering  & Environmental Services, Inc. Logo

JRH

Engineering & Environmental Services, Inc.

JRH Engineering & Environmental Services, Inc. Logo

Engineering & Environmental Services

JRH

Permitting Process for Outfalling to Named Channels in Harris County

  • JRH Engineering & Environmental Services, Inc.
  • Mar 28
  • 4 min read

Permitting Process for Outfalling to Named Channels in Harris County


Understanding the Permitting Process for Outfalling to Named Channels in Harris County


As the premier provider of civil engineering, structural engineering, and environmental engineering services in North Carolina and Texas, JRH Engineering & Environmental Services is committed to guiding property owners and developers through complex regulatory processes.


One such process that requires careful navigation is outfalling to named channels in Harris County, Texas.


This comprehensive guide will walk you through the permitting requirements, key agencies involved, and steps to ensure compliance with local regulations.


Defining Named Channels in Harris County

What Constitutes a Named Channel?


In Harris County, named channels are part of a unique numbering system used by the Harris County Flood Control District (HCFCD) to track the 2,500 miles of bayous and channels in the county1.


These channels are given specific Unit Numbers, which help identify them definitively.


For example, Harris County has three Turkey Creeks in different watersheds, but their Unit Numbers distinguish them from each other1.


Significance of Named Channels


Named channels play a crucial role in Harris County's drainage network.


They are part of the county's flood control infrastructure and are subject to specific regulations and oversight.


Understanding whether your project outfalls to a named channel is essential, as it triggers particular permitting requirements.


Why Permitting is Required for Outfall Projects

Flood Control and Environmental Protection


Permitting for outfall projects is necessary to ensure that any modifications or additions to the drainage system do not negatively impact flood control efforts or environmental quality.


The Harris County Flood Control District and other agencies need to assess the potential effects of your project on the overall drainage network.


Regulatory Compliance


Outfalling to named channels involves multiple regulatory bodies, each with its own set of requirements.


Obtaining the necessary permits ensures that your project complies with local, state, and federal regulations, protecting you from potential legal issues and fines.


Key Agencies Involved in the Permitting Process

Harris County Flood Control District (HCFCD)


The HCFCD is the primary local agency responsible for flood control in Harris County.


They manage the county's vast network of bayous, channels, and detention basins1.


Harris County Engineering Department


The Harris County Engineering Department plays a crucial role in reviewing and approving development plans, including those involving outfalls to named channels4.


U.S. Army Corps of Engineers (USACE)


The USACE is involved in permitting for projects that may affect waters of the United States, including many of Harris County's named channels6.


Texas Commission on Environmental Quality (TCEQ)


While not explicitly mentioned in the search results, the TCEQ is often involved in permitting processes related to water quality and environmental protection in Texas.


General Steps in the Permitting Process


1. Preliminary Assessment


Before beginning the formal application process, assess whether your project outfalls to a named channel using the HCFCD Unit Numbering System1.


2. Application Submission


Submit a permit application to the Harris County Engineering Department. This typically includes:

  • Detailed project plans

  • A fee (e.g., $300 for some permits)5

  • Proof of ownership and maintenance responsibility

  • An Affidavit to the Public5


3. Interagency Review


Your application will be reviewed by multiple agencies, including the HCFCD and potentially the USACE6.


4. Additional Documentation


You may need to provide:

  • A copy of the Notice of Intent (NOI) for stormwater discharge associated with construction activity5

  • Environmental assessments or wetland delineations, if required


5. Approval and Permit Issuance


If all requirements are met, the County Engineer will issue the permit5.


Typical Timelines and Factors Causing Delays


While specific timelines can vary, the permitting process for outfalling to named channels can take several months. Factors that may cause delays include:

  • Incomplete applications

  • The need for additional environmental studies

  • Coordination between multiple agencies

  • High volume of applications


To minimize delays, ensure your application is complete and respond promptly to any requests for additional information.


Common Challenges in the Permitting Process

Interagency Coordination


One of the primary challenges is coordinating between various agencies involved in the process.


Each agency may have different requirements and timelines, which can complicate the process.


Technical Complexity


Outfall projects often involve complex engineering and environmental considerations.


Ensuring your plans meet all technical requirements can be challenging and may require expert assistance.


Changing Regulations


Flood control and environmental regulations can change, especially in response to major flood events.


Staying up-to-date with the latest requirements is crucial but can be challenging.


Environmental Concerns


Projects outfalling to named channels may raise environmental concerns, particularly regarding water quality and habitat protection.


Addressing these concerns adequately can be time-consuming and may require additional studies or design modifications.


Final Thoughts


Navigating the permitting process for outfalling to named channels in Harris County requires careful planning, attention to detail, and often expert guidance.


As the premier provider of civil engineering, structural engineering, and environmental engineering services in North Carolina and Texas, JRH Engineering & Environmental Services is well-equipped to assist property owners and developers through this complex process.


By understanding the significance of named channels, the key agencies involved, and the general steps of the permitting process, you can better prepare for your project and anticipate potential challenges.


Remember that while the process can be complex, it serves the important purpose of ensuring that development projects contribute to, rather than hinder, Harris County's flood control and environmental protection efforts.


Citations:

  1. https://www.hcfcd.org/About/Flooding-and-Floodplains/Drainage-Network/HCFCD-Unit-Numbering-System

  2. https://www.hcfcd.org/Resources/Glossary

  3. https://www.harriscountyga.gov/wp-content/uploads/2022/07/Article-10-Erosion-Control-and-Stormwater-Management_DRAFT.pdf

  4. https://www.aqualisco.com/wp-content/uploads/2019/08/Harris-County-Stormwater-Quality-Management.pdf

  5. https://reduceflooding.com/wp-content/uploads/2019/10/SWQ_regs.pdf

  6. https://www.swg.usace.army.mil/Portals/26/docs/regulatory/GPs/RGP_HCED_2011_00629.pdf?ver=2019-06-03-122805-973

  7. https://www.tceq.texas.gov/downloads/permitting/wastewater/title-iv/tpdes/wq0001539000-oxyvinylslp-battlegroundchloralkaliplant-harris-tpdes-adminpackage.pdf

  8. https://communityimpact.com/katy/city-county/2017/05/19/heres-business-owners-say-city-county-permitting-processes/

  9. https://www.constructionecoservices.com/blog/stormwater-regulatory-update-harris-county-city-of-houston/

  10. https://www.eng.hctx.net/permits/Civil

  11. https://pcs.harriscountytx.gov/Services/Permit-Services

  12. https://www.eng.hctx.net/Consultants/Floodplain-Management/Floodplain-Information

  13. https://www.permitflow.com/blog/harris-county-building-permit

  14. https://www.harriscountyfemt.org

  15. https://www.tshaonline.org/handbook/entries/channel-tx

  16. https://www.h-gac.com/getmedia/bb28f2cd-54ba-4d72-94b4-bb463e744e6e/ab_wpp_armand_bayou_appendix_g_hcfcd_stream_designations

  17. https://www.tshaonline.org/handbook/entries/harris-county

  18. https://www.hcfcd.org/About/Flooding-and-Floodplains/Drainage-Network/Harris-Countys-Watersheds

  19. https://www.harriscountyfws.org/?View=full

  20. https://www.harriscountytx.gov

  21. https://en.wikipedia.org/wiki/Harris_County,_Texas

  22. https://www.eng.hctx.net/portals/23/fpmregs-effect190709.pdf

  23. https://porthouston.com/about/our-port/background-history/

  24. https://www.tshaonline.org/handbook/entries/houston-ship-channel

  25. https://houstonrecovers.org/wp-content/uploads/2018/06/IDM-CH-9-Show-changes.pdf

  26. https://www.harriscountyga.gov/wp-content/uploads/2022/07/FINAL_Article-11-Procedures-and-Permits_DRAFT_Clean.pdf

  27. https://www.hcfcd.org/Activity/Additional-Programs/Stormwater-Quality/Stormwater-Permit-Compliance

  28. https://www.tceq.texas.gov/downloads/permitting/wastewater/title-iv/tpdes/reterracorporationand1503hadenroadllc-reterrafacility-wq0000662000-nori-eng.docx

  29. https://www.savebuffalobayou.org/?page_id=6431

  30. https://www.eng.hctx.net/permits/Stormwater-Code/Stormwater/Stormwater-Quality-Permit

  31. https://www.hcfcd.org/Activity/Additional-Programs/Development-Coordination-and-Inspection

  32. https://www.hcfcd.org/Z-08

  33. https://www.houstonpermittingcenter.org/municipal-separate-storm-sewer-system-ms4

  34. https://texasriparian.org/wp-content/uploads/2013/02/Harris-County-LID-and-GI-Design-Criteria-Manual.pdf

  35. https://www.eng.hctx.net/permits/Residential/Permitting/Bulkheads-Boat-Lifts

  36. https://www.eng.hctx.net/permits/Floodplain-Management

  37. https://www.hcfcd.org/Community/Press-Room/post/harris-county-flood-control-district-and-u-s-army-corps-of-engineers

  38. https://www.eng.hctx.net/portals/23/infraregs-effect190709.pdf

  39. https://www.eng.hctx.net/permits/All-Regulations-Documents-Forms

  40. https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Obtain-a-Permit/

  41. https://epermits.harriscountytx.gov

  42. https://www.hcfcd.org/Community/Press-Room?post=Harris+County+Flood+Control+District+and+The+U.S.+Army+Corps+of+Engineers+Announce+Path+Forward+for+The+Buffalo+Bayou+and+Tributaries+Resiliency+Study

  43. https://www.hcfcd.org/Activity/Projects/Cypress-Creek/Champions-Stormwater-Detention-Basin-K500-24-00

  44. https://www.houstonpermittingcenter.org/office-city-engineer/floodplain-management-office

  45. https://epermits.harriscountytx.gov/ExternalPowerRelease.aspx

  46. https://www.houstonpermittingcenter.org/office-city-engineer/design-and-construction-standards

  47. https://www.hcfcd.org/Resources/FAQ

  48. https://www.tceq.texas.gov/permitting/stormwater

  49. https://www.tceq.texas.gov/downloads/permitting/water-rights/pending/notice/simssouthwestcorp-13841-noticepkg.pdf

  50. https://www.houstonpublicworks.org/sites/g/files/nwywnm456/files/doc/003-industrial_waste_permit_application.pdf

  51. https://www.houstonpermittingcenter.org/media/5006/download

  52. https://www.tceq.texas.gov/permitting/wastewater

  53. https://www.tceq.texas.gov/downloads/permitting/stormwater/general/construction/txr15rtc.pdf

  54. https://subcusa.com/five-must-know-secret-tips-avoid-delays-city-building-permitting/

  55. https://www.micoequipment.com/blog/top-causes-of-construction-delays-in-houston-texas/

  56. https://www.houstonpermittingcenter.org/office-city-engineer/stormwater

  57. https://www.micoequipment.com/blog/top-reasons-for-construction-project-delays-in-houston-texas/

  58. https://epermits.harriscountytx.gov/PublicProjectStatus.aspx

  59. https://www.texaspolicy.com/legepropertyandgovpermit/

  60. https://www.eng.hctx.net/permits/Residential

  61. https://www.hcfcd.org/Activity/Capital-Improvement-Program/Subdivision-Drainage-Projects

  62. https://www.tceq.texas.gov/downloads/permitting/waste-permits/pendingpermitappsfiles/msw-261b-noticemod-techcomplete.pdf

  63. https://www.eng.hctx.net/permits

  64. https://texasriparian.org/wp-content/uploads/2013/02/HCFCD-Streambank-Stabilization-Handbook.pdf

  65. https://publicinput.com/wp/community-engagement-case-study-harris-county-flood-district/

  66. https://reduceflooding.com/wp-content/uploads/2022/06/HCFCDmediaGuide2017-small.pdf

  67. https://www.hcfcd.org/Resources/Technical-Manuals/Channel-System-Unit-Numbers

  68. https://en.wikipedia.org/wiki/Houston_Ship_Channel

  69. https://historicalcommission.harriscountytx.gov/portals/historicalcommission/documents/Communities%20in%20Markers.pdf

  70. https://rsbenv.com/services/environmental-compliance/storm-water/harris-county-tx/

  71. https://pcs.harriscountytx.gov/Services/Water-Services

  72. https://ascehouston.starchapter.com/images/HCFCD_DCID_Presentation_ASCE.pdf

  73. https://cypressei.com/engineering/army-corps-of-engineers-nationwide-permit/

  74. https://www.ghba.org/wp-content/uploads/pdf/govt/2-HCFCD-PCPM-Atlas14-Guidelines-Updated-Chapters_Final.pdf

  75. https://porthouston.com/infrastructure/resources/dredging-marine-permits-licenses/

  76. https://www.reddit.com/r/houston/comments/jl30tr/permit_process_for_new_home_construction_help_me/

  77. https://communityimpact.com/houston/cy-fair/development-construction/2017/02/17/business-community-says-commercial-permitting-process-delays-openings-cyf/

  78. https://www.mitchellwilliamslaw.com/concrete-batch-plants-harris-county-challenges-amended-air-quality-standard-permit-issued-by-texas-commission-on-environmental-quality


Comments


bottom of page